How,Properly,Stack,Spiral,Weld technology How to Properly Stack Spiral Welded Steel Pipe
The electronic cigarette is not new. People who buy electronic cigarette knows that this product has been in the market for years now. Despite some sectors apparently trying to shoot the product down from the shelves, the popularity of elect Active shredder safety technology for the small office. Shreds 15sheets per pass into 5/32" x 1-1/2" cross-cut particles (Security Level3). Patented SafeSense® Technology stops shredding when hands touch thepaper opening. Designated shredde
Sprial welded steel pipe stacked right help protect the quality of spiral steel pipe, spiral steel pipe prolong life, prevent deformation, erosion, so orderly stacking spiral steel pipe, but also conducive to late spiral pipe loading, inventory. Spiral Pipe buyers should also strictly in accordance with the requirements of spiral steel pipe pile.1) Spiral pipe open dumps, following necessary pad with wood or stone, stack surface needs slightly tilted to facilitate drainage, and pay attention to the material placed flat to prevent the causing bending.2) Spiral pipe principle requires stacking under palletizing firm to ensure the safety of the premise, to do according to species, palletizing specifications, different varieties of materials to palletizing respectively, to prevent muddy and mutual erosion, but also easy to install a library car.3) Prohibit storage of steel aggressive action items in spiral steel pipe pile position around.4) Mild steel pipe pile bottom should be padded, strong, smooth, prevent moisture or material deformation,5) The same material by successively respectively stacking storage.6) Spiral steel stacking height, artificial homework does not exceed 1.2m, mechanical homework does not exceed 1.5m, stack no larger than 2.5m,7) Be left between the stacks and stacks of certain passages, check road is generally O. 5m, of access depending on the size and material transport machinery, generally is 1.5 ~ 2.0m,8) Open dumps angles and channels should stoop to put that mouth down, beam shall stand up, you can not be up and groove steel to avoid rusting water.9) The end of booster stack, if the warehouse sunny cement floor, to elevate O.1m, if the mud shall booster O.2 ~ 0.5m. If it is open space, concrete floor booster 0.3 to 0.5 m, the surface mud booster 0.5 ~ 0.7m.If you would like to know more about carbon steel pipe and structual steel pipe,pls contact us.
How,Properly,Stack,Spiral,Weld